Product

Big Plastic Drinking Cups

Self-design plastic injection pp cup Delivery time: 7-15days after deposit Payment: TT / western union / Alibaba Trade Assurance Product description of big plastic drinking cups Features of big plastic drinking cups 1. Self-design & Uncommon shape 2. More thick & transparent 3. Good...

Send InquiryChat Now
Product Details

Self-design plastic injection pp cup
Delivery time: 7-15days after deposit
Payment: TT / western union / Alibaba Trade Assurance


Product description of big plastic drinking cups

Item.No

C700

Color

clear

Material

Food grade original PP material

Capacity

700ml

Weight

29g/pcs

Product Size

90*58*175mm

Package

500lid/ctn+500box/ctn

Carton size

cup: 45*36*40cm lid: 51.5*18.5*46cm

Usage

milky tea cup

delivery time

7-15 days after deposit



Features of big plastic drinking cups
1. Self-design & Uncommon shape
2. More thick & transparent
3. Good toughness & unbreakable
4. Leakproof / Good airtightness
5. Eco-friendly & food grade PP material
6. Suitable for microwave and freezing
7. Convenient for take-away milky tea / juice / coffee or any kind of drink package




image011(001).jpg

Q: WHAT IS YOUR GOODS' QUALITY GUARANTEE?
We provide goods guarantee 6 months after delivery. When you receive goods, and find any defect, pls provide the pictures, video and show quantity of defective products, we'll compensate the relative qty, and send together with your next order.

Q: CAN WE HAVE A SAMPLE? IF IT WILL BE CHARGED, AND HOW LONG IT TAKES TO RECEIVE?
A: Yes, normally samples are with stock for free, shipping cost at your side.
By express (UPS, DHL, Fedex, TNT, etc) it will take 3-5 days to arrive; Epacker takes longer sometimes like 2 to 3 weeks.
Shipping cost USD20 to 70 (settled by Paypal), depends on size, qty, weight, and service way.
Or collect service by your account.
In case samples to be newly made, USD$150 is chargeable due that the sampling cost is high.

Q: WHAT'S YOUR DELIVERY TIME?
A: Depends on quantity, artwork available time, pre-order test needed or not, pre-production sample approval time, etc.
After pre-production sample confirmed, lead time can be 3 to 60 days, depends on quantity, or which product and which kind of package it is.
25 to 45 days is common for mass production. Please always let us know your need.

Q: WHAT'S THE TOOLING TIME SHALL WE HAVE AN OEM PROJECT?
A: Depends on product size, structure, etc.
It can be from 30 to 45 days.


Hot Tags: big plastic drinking cups, China, suppliers, manufacturers, factory, wholesale, buy, cheap, customized, low price, made in China
Related Products
Inquiry